Hershey Bathroom

The Original Request

Refinish of a powder room to include custom board and batten wainscoting around the entire powder room. Custom design and selection of appropriate materials to maximize counter space and storage space below the counter while minimizing obstruction of the bathroom door and walkway. Installation of a new vanity, countertop, sink, faucet, tile floor, light fixture, bathroom hardware, and mirror.

Timeline

1.5 weeks from first contact to completion.

Materials Used

Vanity, countertop, sink, faucet, tile flooring, grout, finish pine boards, mirror, lighting fixture, bathroom hardware, paint, caulk, nails, and screws.

Work You Won't See in the Photos

Installation of new GFCI outlets to ensure the bathroom was up to building code.

What Was Completed

Removal of the old sink, vanity, faucet, and countertop. Removal of the old flooring, bathroom hardware, lighting fixture, and mirror.

Drywall repair to ensure a seamless look at project completion. Painting of walls and ceiling using premium paint. Installation of tile flooring and grout.

Installation of the vanity, countertop, sink, and faucet. Installation of new bathroom hardware, such as a towel rack and toilet paper roll hanger. Connection of the water supply and drain lines to the faucet and sink, respectively. Painting of all trim and the bathroom door.

Gallery

Have Project in mind?

If you are looking for an expert carpenter, bespoke furniture specialists contact us today.

Be inspired by our projects

Madonna Built-In

Custom Built-Ins

Madonna Built-In

Madonna Office

Trim, Molding, Shiplap & Wall Finishes

Madonna Office